The Violations That Weren't
In the first nine months of 2026, according to the grid's independent market monitor, 27,448 of the 31,240 transmission "violations" in PJM's real-time market (87.9%) were breaches only of limits that PJM's own operators had set below the lines' actual ratings. The monitor says the transmission owners set those ratings by methods that neither FERC, PJM nor the monitor itself reviews. Those breaches were priced by the $2,000/MWh penalty factor, which is the real-time default; their average shadow price was $1,999.84/MWh in the monitor's table and $1,995.20/MWh in its text. Penalty factors on all 31,240 violated constraint intervals, not only the 27,448, made up $14.11/MWh of the $74.98/MWh average real-time price, or 18.8%, a contribution the monitor values at $9.0 billion of the $47.6 billion cost of real-time load [FACT, monitor's figures]. The monitor puts that contribution at $0.06/MWh had the limits not been reduced, which is its sensitivity-factor estimate, not a redispatch of the market [FACT that the monitor calculated it].
The monitor published those counts on 12 November 2026, in a 930-page quarterly report on a market that covers all or parts of 13 states and the District of Columbia. The same day's press release said penalty factors drove $8.81/MWh of the year's $24.47/MWh price rise. It did not say why: the words "control limit", "line rating" and "reduced" do not appear in it [FACT].
The monitor's nine-month count
PJM's dispatch software, known as SCED, re-solves the grid every five minutes. When power flow on a line exceeds the limit the software is told to respect and no cheaper generator can relieve it, the software lets the limit be breached and prices the breach with an administrative "penalty factor". That is $2,000/MWh in the real-time market [FACT]. The penalty becomes the constraint's shadow price, and the shadow price flows straight into the locational marginal price (LMP) paid for energy.
The monitor counts these events in constraint intervals: one transmission constraint in one five-minute interval. That unit is not hours, and it is not days. Between January and September 2026, 197,821 constraint intervals had a nonzero shadow price, and in 31,240 of them (15.8%) the flow exceeded the limit used in SCED [FACT].
The monitor then split those 31,240 into two kinds:
| Jan–Sep | Actual line limit breached | Only PJM-reduced limit breached | Reduced share | |---|---|---|---| | 2025 | 2,773 | 15,724 | 85.0% of 18,497 | | 2026 | 3,792 | 27,448 | 87.9% of 31,240 |
Units: constraint intervals. Source: Monitoring Analytics, 12 Nov 2026 [FACT].
For the second kind, the report is blunt: "In those cases, the actual line limit was not violated." In all of them, "the shadow prices and resulting LMPs were set by the transmission constraint penalty factors" [FACT]. Reduced-limit violations rose 74.6% on the year and actual-limit violations 36.7% [FACT, derived].
The winter storm is part of the story, but not most of it. Winter Storm Fern (22–30 January) accounts for 5,821 of the 31,240 violations, or 18.6% [FACT].
Source and method
Source: Monitoring Analytics (PJM Independent Market Monitor), 2026 Quarterly State of the Market Report for PJM: January through September, published 12 Nov 2026.
How it is sourced: Counts and the reduced share as the monitor publishes them (S1, Table 3-55; FACTS F6b for 2025).
Unit: constraint intervals, Jan–Sep · blue: only PJM-reduced limit violated · grey: actual line limit violated
Violated constraint intervals in PJM's real-time market, January–September of each year: one transmission constraint in one five-minute interval, never hours or days (FACTS F3, F6). Blue ("Only PJM-reduced limit violated"): flow exceeded only the control limit PJM had set below the line's actual rating; grey ("Actual line limit violated"): flow exceeded the actual limit. The blue segment is lettered with its share of the year's total inside it; the total stands past the bar. The monitor's count (S1).
The table, its licence and its date.
Cite this: Token Runner, “The violations that weren't”, tokenrunner.ai/energy/violations-that-werent/ built 14 November 2026. CC BY 4.0.
The rows
| Period | Only a PJM-reduced limit exceeded (constraint intervals) | All violated constraint intervals | Reduced-limit-only share of all, % |
|---|---|---|---|
| 2025 (Jan–Sep) | 15,724 | 18,497 | 85 |
| 2026 (Jan–Sep) | 27,448 | 31,240 | 87.9 |
All 2 rows the chart drew.
A five-percent trim and a $2,000 price
The mechanism is written into PJM's own rulebook. Manual 12, PJM's balancing-operations manual (revision 57, effective 22 April 2026), says the dispatcher sets a "threshold" for each constraint. That threshold directs SCED "to control to the threshold percentage of the appropriate facility rating … usually 95–100 percent of facility rating", and "PJM staff has the ability to adjust the control percentage on an individual constraint basis" [FACT].
The monitor says operators "routinely" set that control percentage at 95% of the actual rating [FACT, monitor's observation]. Among the 2026 reduced-limit violations, the average cut was 5.1%, the same as in 2025 [FACT]. A line can therefore run below what its owner says it can carry, say at 96% of its rating against a 95% control limit, yet register as "violated" in the dispatch software and set a $2,000/MWh shadow price [ILLUSTRATIVE: the 96% is our example, not a recorded case].
Who checks the rating underneath is a separate question. In a footnote, the monitor states: "Actual transmission line limits are set by the transmission owner. PJM chooses the control limits. At present the actual line rating methods are not reviewed by FERC, or PJM, or the MMU" [FACT, the monitor's statement].
The money is large on every basis, and the bases must be kept apart:
- **Level.** Penalty factors contributed $14.11/MWh to the January–September 2026 real-time load-weighted average LMP of $74.98/MWh, or 18.8% [FACT]. Only gas, at $24.00/MWh, contributed more. In 2025 the figure was $5.31/MWh, so it rose about 2.7 times [FACT, derived].
- **Change.** Of the $24.47/MWh rise in that average from 2025 to 2026 (+48.4%), $8.81/MWh (36.0%) came from penalty factors. That is the largest single component of the increase; fuel and consumables were next at $5.73/MWh [FACT].
- **Money.** $9.0 billion of the $47.6 billion cost of real-time load. The monitor notes this is more than five times the $1.41 billion of energy uplift charges over the same nine months [FACT].
Reasons on the record
The monitor tabulates the reasons PJM operators entered for the reduced limits, counted in constraint intervals, the same unit as the violations. For most of those violations, no reason was entered. Of the 27,448 reduced-limit violations in 2026, the tabulation shows [FACT]:
- **No reason provided:** 22,385 (81.6%).
- **Relief calculated by SCED less than the operator's desired relief:** 2,709 (9.9%).
- **Volatile power flow:** 1,825 (6.6%).
- **Prepositioning generation:** 310 (1.1%).
- **"TO identified flow greater than PJM's":** 219 (0.8%).
- **Thermal surrogate:** the source shows no entry for 2026. That is a blank, not a zero.
The share with no reason barely moved through the year. It was 81.5% at the half-year mark (16,363 of 20,073), in the monitor's August report [FACT].
Source and method
Source: Monitoring Analytics (PJM Independent Market Monitor), 2026 Quarterly State of the Market Report for PJM: January through September, published 12 Nov 2026.
How it is sourced: Counts and shares as the monitor publishes them (S1, Table 3-59).
Unit: constraint intervals, Jan–Sep 2026, of 27,448
The reason PJM operators recorded for each reduced control limit, across the 27,448 violated constraint intervals with a reduced limit, January–September 2026 (FACTS F7, F8); one constraint interval is one constraint in one five-minute interval. Thermal surrogate has no entry ("-" in the source): left blank, not zero.
The table, its licence and its date.
Cite this: Token Runner, “Why the limits were cut”, tokenrunner.ai/energy/violations-that-werent/ built 14 November 2026. CC BY 4.0.
The rows
| Reason as recorded | Reduced-limit violated constraint intervals, Jan–Sep 2026 | Share of the 27,448, % |
|---|---|---|
| No reason provided | 22,385 | 81.6 |
| Relief calculated by SCED less than operator's desired relief | 2,709 | 9.9 |
| Volatile power flow | 1,825 | 6.6 |
| Prepositioning generation | 310 | 1.1 |
| TO identified flow greater than PJM's | 219 | 0.8 |
| Thermal surrogate |
All 6 rows the chart drew.
The six-cent counterfactual
The headline counterfactual is striking, and it needs its qualifier. The monitor estimates that, "if the control limits had not been artificially reduced and everything else remained unchanged", the penalty-factor contribution would have fallen 99.6%, from $14.11/MWh to $0.06/MWh. For 2025 the equivalent fall is from $5.31/MWh to $0.03/MWh [FACT that the monitor calculated it].
The report itself says how that number was made: "The MMU calculates the impact on system prices based on analysis using sensitivity factors. The transmission constraint penalty factor contribution with actual line limits is not based on a counterfactual redispatch of the system" [FACT]. It is a model estimate, not an observed price. Re-running the market with the full ratings could produce other binding constraints, other prices, or real violations. The estimate does not capture any of those.
Source and method
Source: Monitoring Analytics (PJM Independent Market Monitor), 2026 Quarterly State of the Market Report for PJM: January through September, published 12 Nov 2026.
Whose figures: The monitor's figures (S1, Table 3-60): the as-priced contribution and the monitor's own estimate at actual limits, attributed to the monitor.
Unit: $/MWh, Jan–Sep · *monitor's model estimate
The contribution of transmission constraint penalty factors to the real-time load-weighted average LMP, January–September of each year (FACTS F13). The estimate (dashed outline) is the monitor's sensitivity-factor calculation of that contribution with the lines' actual limits, not a redispatch and not an observed price (FACTS F18; S1-h); PJM disputes the method (F27).
The table, its licence and its date.
Cite this: Token Runner, “The penalty price, with and without the trimmed limits”, tokenrunner.ai/energy/violations-that-werent/ built 14 November 2026. CC BY 4.0.
The rows
| Period | As priced (PJM-reduced limits), $/MWh | Monitor's estimate at actual line limits (model output), $/MWh |
|---|---|---|
| 2025 (Jan–Sep) | 5.31 | 0.03 |
| 2026 (Jan–Sep) | 14.11 | 0.06 |
All 2 rows the chart drew.
The monitor's verdict, that penalty factors "are applied incorrectly about 94 percent of the time", is its judgment, not ours [FACT that the monitor says it]. That 94 percent is the monitor's characterisation of how often penalty factors are applied incorrectly; it is a different measure from the 87.9% above, which is the counted share of violated constraint intervals that breached only a reduced limit. Its recommendation to end "manual and automated discretionary reductions in the control limits" dates from 2015. The report lists its status as "Partially adopted 2020" [FACT].
PJM's case for the trim
PJM's most recent published answer that we found is its August 2025 response to the monitor's 2024 annual report. It said operators adjust control percentages "not as an alteration of the facility ratings provided by Transmission Owners, but as a necessary real-time reliability measure" [CLAIM]. It cited "insufficient or delayed generation response to dispatch signals, unexpected interchange schedule deviations, rapid changes in renewable resource output (solar and wind), and unanticipated load impacts on specific constraints". It added that "lowering CPs is a tool PJM system operators must use today to effectuate timely redispatch and maintain system reliability" [CLAIM].
PJM also disputed the method behind the monitor's 2024 estimates: "The IMM's analysis appears to be based on a counterfactual approach rather than actual RT SCED case reruns" [CLAIM]. That objection matches the monitor's own footnote. We found no published rerun from either side.
We found no PJM response to the 2025 annual report or to either 2026 quarterly report. PJM's 2025 explanation therefore stands as its position, not as a reply to these numbers [SIGNAL: absence found in one search, not proven].
The summer quarter on its own
Comparing the nine-month report with the monitor's half-year report of 13 August isolates July to September. On that comparison, penalty factors cost about $3.0 billion of $18.3 billion in real-time load cost in the third quarter, roughly a sixth, against roughly a fifth in the first half [FACT, derived by subtraction; assumes no revisions; inputs rounded to $0.1 billion]. We print those shares in words because a decimal would be false precision, an artefact of the rounding: the $3.0 billion alone carries ±$0.1 billion. Reduced-limit violations were 7,375 of 8,689 (84.9%), against 89.0% in the first half [FACT, derived].
Both comparisons moved the same way, and the reduced-limit share fell from 89.0% to 84.9% [SIGNAL: two data points].
The reserve-shortage workbook
What follows is a different mechanism, and not part of the trim finding: a gap between the run that prices the grid and the run that dispatches it. It sits in a spreadsheet posted with the report. Since fast-start pricing began on 1 September 2021, PJM has run two versions of each interval: a dispatch run that moves generators and a pricing run that sets the price. The monitor reports that in January–September 2026 the real-time pricing-run LMP exceeded the dispatch-run LMP by $8.90/MWh, or 13.5% [FACT]. It also says the pricing run produced reserve shortages that "did not occur in the actual, or dispatch run, market dispatch" [FACT, monitor's statement].
Our count of the workbook's cells supports that statement [FACT, our count]:
- The sheet lists 333 five-minute intervals of RTO primary-reserve shortage pricing, from 24 January to 17 September.
- In 289 of them the pricing run shows a real shortage, above 0.001 MW.
- In 173 of those 289 (59.9%) the dispatch run shows none. 113 of the 173 fell in July and 55 in September.
- Within the sheet, every row with a dispatch-run shortage also shows a pricing-run shortage: 116 rows (289 − 173). The sheet lists only shortage-pricing intervals, so it cannot show a dispatch-run shortage outside them.
- The deepest shortage was 2,150.66 MW, at 18:55 EPT on 8 July, against a requirement of 3,305.1 MW.
- The highest capped reserve price was $1,238.38/MWh, at 20:05 EPT on 2 July. In that interval the pricing run was 819.8 MW short and the dispatch run was not short at all.
Two things in the workbook remain unexplained:
- **Totals.** The report counts 345 shortage-pricing intervals on 36 days; the workbook has 333 rows on 29 days. The 29 June–15 July subset matches exactly (153 in both). The January–February subset does not: 56 rows in the workbook against 40 intervals in the report. We publish both and mark the gap open.
- **Tiny shortages.** 44 January–February rows show a pricing-run shortage of 0.00001 MW priced at $300/MWh. Whether that is a modelling floor or something else, the documents do not say [SIGNAL, open question].
Limits of the count
- **One origin.** Every count here comes from one place: the monitor's tabulation of PJM's dispatch data. The independent check would be PJM's Data Miner feed of five-minute "Limit Control Percentage" values, but it requires a subscription key, which this desk did not use. The count is single-origin.
- **The mechanism is confirmed separately.** PJM's own manual and its 2025 response independently confirm that the trims exist. They confirm the practice, not the number.
- **Data Center Alley.** The report ties a record day of up-to-congestion trading profits to violations on 230 kV lines in "Data Center Alley" on 26 May, during a line outage [FACT, monitor's account]. We did not establish whether those violations were against reduced or actual limits, and we do not infer it.
- **Errors in the report.** The monitor's text gives $1,995.20/MWh as the 2026 average shadow price for reduced-limit violations, but its table prints that number under 2025 and shows $1,999.84/MWh for 2026. Either way, it is about 7.3 times the $272.18/MWh average for constraints that bound without violating. A sentence on penalty-factor magnitudes is labelled "2025" but carries 2026 figures. We print the table values and note the typos.
Sources
- FACT — Monitoring Analytics, LLC (Independent Market Monitor for PJM), 2026 Quarterly State of the Market Report for PJM: January through September, 12 November 2026
- FACT — Monitoring Analytics, LLC, IMM_Reserve_Shortages_20261112.xlsx, posted with the above (file dated 10 November 2026). Counts are our own
- FACT — Monitoring Analytics, LLC, 2026 Quarterly State of the Market Report for PJM: January through June, Section 3, 13 August 2026
- FACT — PJM Interconnection, Manual 12: Balancing Operations, revision 57, effective 22 April 2026
- CLAIM — PJM Interconnection, PJM Response to the 2024 State of the Market Report, August 2025
- FACT — Monitoring Analytics, LLC, "Market Monitor Finds PJM Wholesale Electricity Markets Competitive", PR Newswire, 12 November 2026